Here's just a small sampling of the projects we've worked on over the years.

 

HomeStreet Bank Tacoma
RAFN Company

The Junction Mixed Use
Gen Cap Construction

Stone Way Apartments
Compass General Construction

LIV Wallingford
Village Builders

LIV Roosevelt
Village Builders

The Mark 801 5th Avenue, Misc.
Superior Steel and Ironworkers

400 Dexter, Misc.
BN Builders

Lincoln Square Expansion
GLY Construction

Living Computers: Museum + Lab
Abbott Construction

UCUCC Canopies
RAFN Company

CenturyLink Field Press Box and Suite Remodel
Abbott Construction

 

Fred Hutchinson Cancer Research Center Stairs
Lease Crutcher Lewis

Union Stables
Lease Crutcher Lewis

First Hill Medical Pavilion
Lease Crutcher Lewis

Vulcan Block 52 East, Misc.
GLY Construction

Vulcan Block 44, Misc.
GLY Construction

KEXP Studios at Seattle Center
Sellen Construction

Boeing Building 9-101 Upgrades
Skanska USA

Vulcan Block 35, Misc.
GLY Construction

Microsoft Arcade
GLY Construction

Vulcan Block 34, Misc.
GLY Construction

Suncadia Lodge
Lease Crutcher Lewis


Chris and his team at Redmond Welders provided valuable design feedback on a fast-track project for a major aviation company in the area. Redmond Welders provided the materials for an extremely large steel testing structure, including a specialized slab embedded anchoring system with thousands of anchor points and tight allowable tolerances. The Redmond Welders team was able to heat treat the embeds in the shop after welding to maintain an 1/8” tolerance within each 20-foot length, saving significant time and labor to adjust to tolerance in the field. We were able to pick the members right off of the truck and place them at the proper location with rebar already in place. Redmond Welders also supplied specialized machinery wash steel frames and the steel for large electrical transformer buildings. The steel came out correct and on time. It was a pleasure working with Chris and his team.
— Jed Tsai, Skanska USA